Skip to main content

Airport guide

Aspen (ASE) Airport Guide for Private Flights

Aspen/Pitkin County Airport, Sardy Field (ASE, KASE), owned by Pitkin County, is the airport closest to downtown Aspen and Snowmass Village. It sits at 7,838 feet with one 8,006-foot runway and one FBO, Atlantic Aviation.

From DJT it is about 1,536 nautical miles in a straight line, or about 3 hr 35 min to 4 hr 10 min airborne in still air for representative light to super midsize jets: an indicative time, not a schedule. Winter headwinds make the westbound leg longer, and range, not speed, decides which aircraft can fly it nonstop.

Three facts decide an Aspen trip before price does. The airport will be closed to all flights, private included, from 11 p.m. on Sunday, April 4, 2027 to 7 p.m. on Friday, November 19, 2027 while the runway is rebuilt. Aircraft with a wingspan over 95 feet cannot use it at all. And the airport closes every night from 11 p.m. to 7 a.m., with no departures after 10:30 p.m. ASE has no customs.

Information checked October 25, 2026.

Business jets parked on the apron at Aspen/Pitkin County Airport, with the terminal, autumn trees and mountains behind.
Photo: Jeffrey Beall, CC BY 4.0, cropped

Key facts

The table below lists ASE's identifiers, runway, tower hours, customs status, FBO and operating rules, each with its source.

Aspen at a glance

ItemDetail
IdentifiersFAA ASE · ICAO KASE · IATA ASE
Also known as: Aspen Airport
LocationAspen, Colorado
Runways (physical length × width)15/33: 8,006 × 100 ft, asphalt, grooved
Field elevation7,837.9 ft
Control towerTower 7:00 a.m. to 8:00 p.m.; attended but uncontrolled 8:00 to 11:00 p.m.
CustomsNo customs and not a CBP user-fee airport; from Canada or Europe, an airport with CBP service first (Eagle County, EGE, the nearest, is a user-fee airport); from Mexico or the Caribbean, the designated airport nearest the border or coastline crossing first unless CBP has exempted the aircraft (19 CFR 122.24)
FBOs (private terminals)Atlantic Aviation ASE, 69 East Airport Road, Aspen, CO 81611
Operating rules to knowClosed to all flights, private included, from 11:00 p.m. April 4, 2027 to 7:00 p.m. November 19, 2027 (runway reconstruction)
Landing distance available 7,006 ft in both directions (FAA data)
Airport closed 11:00 p.m. to 7:00 a.m.; no departures after 10:30 p.m.
Maximum wingspan 95 ft (the county plans up to 118 ft after the 2027 reconstruction; not in force)
Stage 1 jets prohibited; Stage 2 jets only from 7:00 a.m. to 30 minutes after sunset
Prior permission for takeoff on Runway 15; night VFR requires an IFR-equipped aircraft, an instrument-rated pilot and an ASE operation in the past 12 months
Palm Beach (DJT) by private jetAbout 1,536 nm straight line; indicative flight time about 3 hr 35 min to 4 hr 10 min airborne for a nonstop jet (not a schedule)
Runway, elevation and identifier data: FAA airport data effective October 1, 2026. Indicative airborne time to DJT in still air: 20 minutes for climb and descent plus the great-circle distance with a 3% routing allowance, at the published cruise speeds of representative light to super midsize jets (416 to 483 knots); winds, routing and the operator's cruise speed change it, and total trip time adds ground time at each end. Physical runway length is not the distance available for every takeoff or landing; the operator decides whether the proposed aircraft can use the airport for your flight. FBO names and addresses come from operator pages, airport directory listings (some supplied by the FBO itself) or the airport owner's documents, or from flight-planning directories where a row says so; where a row gives no street address, take it from your booking, and confirm the terminal named there. Sources: Aspen/Pitkin County Airport: noise and curfew; Aspen/Pitkin County Airport: 2027 closure; Aspen/Pitkin County Airport: runway reconstruction FAQ; AirNav (FAA data); Aspen/Pitkin County Airport; Atlantic Aviation; onemileatatime.com; aspendailynews.com.

The 2027 closure: what to plan instead

The county's construction page states that ASE closes to all commercial and general aviation from 11 p.m. on April 4, 2027 to 7 p.m. on November 19, 2027, while the runway is rebuilt and moved to FAA design standards.

Trip timing What it means
Ski season through early April 2027 ASE scheduled to operate, subject to construction notices, the nightly curfew and weather; the last movements before the closure are on Sunday, April 4
11 p.m. April 4 to 7 p.m. November 19, 2027 No flights into or out of ASE; plan another airport and the drive
Thanksgiving 2027 and the winter season Reopening is set for 7 p.m. on Friday, November 19; confirm close to the date

The county's reconstruction FAQ names Rifle Garfield County Airport (RIL) as available for general aviation during the closure, and Denver, Grand Junction, Montrose and Eagle County (EGE) for airline service. For a private jet, EGE and RIL are the practical choices, compared under Nearby alternatives below. After reopening, the county plans a 150-foot-wide runway, shifted about 80 feet west, with a wingspan limit of 118 feet or less instead of today's 95 feet. That is the planned configuration, not a current rule: for a late-2027 trip, ask the operator to confirm the rules then in force. Dates: closure page.

Which jets can use Aspen

  • Wingspan: a maximum of 95 feet. This rules out some large-cabin and ultra-long-range jets regardless of runway performance. Ask the operator to state the specific aircraft's wingspan before you accept a quote.
  • Noise class: Stage 1 jets are prohibited; Stage 2 jets may operate only from 7 a.m. to 30 minutes after sunset.
  • Runway: 15/33, 8,006 × 100 feet, sloping uphill about 2% toward the southeast, so landings are usually on Runway 15. Runway 33 has a 1,000-foot displaced threshold. Plan on 7,006 feet of landing distance in either direction; the takeoff run is 7,006 feet on one end and 8,006 on the other, which the operator confirms from the current Chart Supplement.
  • Approaches: there is no ILS. Published procedures are a localizer/DME approach, an RNAV (GPS) approach and the Roaring Fork Visual to Runway 15. High minimums can require an alternate airport even when the forecast looks good.
  • Takeoff on Runway 15 needs prior permission through the FBO.

Elevation, payload and the trip home

The county cites a density altitude of about 9,555 feet on a cool spring morning and roughly 11,000 feet at midday in midsummer. In plain terms, the aircraft performs as if the airport were higher still, so the operator may need to limit passengers, bags or fuel. That matters most on the departure from Aspen, when the aircraft is fueled for the trip home. Ask whether the return to Palm Beach is planned nonstop or with a fuel stop, and what load that assumes.

Aspen/Pitkin County Airport (Sardy Field), ASE from the air

Aerial view of Aspen/Pitkin County Airport (Sardy Field) with its runway outlined
Aspen/Pitkin County Airport (Sardy Field), ASE, from the air, with runway 15/33 outlined. USDA NAIP imagery (public domain), 2019; runway outlines from FAA data. The photograph was taken on September 14, 2019 (Colorado NAIP 2019, via USGS The National Map), so ramps, buildings and works may have changed since; runway ends and widths are from the FAA airport data effective October 1, 2026. Passenger-planning illustration. Not for navigation.

Curfew and night rules

  • Closed 11 p.m. to 7 a.m. No departures after 10:30 p.m. Stage 3 arrivals are prohibited from 11 p.m. and departures from 10:30 p.m. The county grants exemptions only for emergency operations such as medevac, search and rescue and firefighting; apart from emergency medical flights and approved irregular commercial operations, operators that break the curfew face the county's enforcement process, which can include fines (noise and curfew page).
  • Tower: 7 a.m. to 8 p.m. From 8 p.m. to 11 p.m. the airport is attended but uncontrolled.
  • After dark: from 30 minutes after sunset to 11 p.m., a VFR flight requires an IFR-equipped aircraft and an instrument-rated pilot who has taken off or landed at ASE in the previous 12 months; IFR flights must use published procedures.

An evening arrival therefore depends on the crew as well as the clock. Give your preferred arrival time when you request options, and ask the operator whether the proposed crew meets these conditions.

Terrain from 12,500 to 14,000 feet surrounds the field, and the FAA advises against mountain flying unless ceilings and visibility are well clear of it. Weather holds and diversions are part of Aspen planning.

Private terminals (FBOs)

Atlantic Aviation is the only FBO, at 69 East Airport Road, open 6 a.m. to 11 p.m., under a 30-year lease signed in 2024. It offers de-icing, heated hangar space for aircraft up to Gulfstream G450 size, concierge and crew cars. Reservations go through Atlantic's Gateway system, and Atlantic cites special-event fees. It needs 2 hours' notice to stage an aircraft before departure, so a change to your return time is not instant.

Atlantic warns of additional ramp compression from November 25 to 29, 2026 and from December 24, 2026 to January 3, 2027. Local press has reported that Atlantic charges transient aircraft parking by the hour; ask how parking is charged for your dates. For holiday dates, ask whether the aircraft will stay at Aspen or drop and reposition, and how parking and repositioning appear in the quote.

Customs

ASE has no customs and is not on CBP's user-fee airport list. A flight from Canada or Europe clears first at an airport with CBP service (a port of entry, a landing-rights airport or a user-fee airport), and one from Mexico or the Caribbean first lands at the designated airport nearest to where it crosses the border or coast unless CBP has exempted it (19 CFR 122.24). EGE is the nearest user-fee airport, with inspections Thursday to Monday.

Nearby alternatives

Two airports matter for a private jet when ASE does not fit, including throughout the April 4 to November 19, 2027 closure. The schematic below shows EGE's position; the comparison after it gives the road distances.

PlaceStraight-line distance from ASE
Aspenabout 2 nm (3 statute miles) south-east
Snowmass Villageabout 3 nm (4 statute miles) north-west
Alternative airportLongest runwayStraight-line distance from ASE
Eagle County (EGE)9,000 ftabout 25 nm north
Schematic plotted from FAA airport reference points (FAA data effective October 1, 2026) and published place coordinates from Wikipedia (secondary); not a map or a navigation chart. Straight-line distance is not the road journey or a drive-time estimate.
Item Aspen (ASE) Eagle County (EGE) Rifle Garfield County (RIL)
Runway 8,006 × 100 ft; 7,006 ft landing distance 9,000 × 150 ft, ILS; built for aircraft up to Boeing 757 size 7,000 × 100 ft
Tower 7 a.m. to 8 p.m.; airport closed 11 p.m. to 7 a.m. 7 a.m. to 7 p.m. None; attended around the clock
Customs None CBP user-fee airport, Thursday to Monday None listed
FBO Atlantic Signature Confirm with the operator
Road to downtown Aspen About 3 miles About 68 miles via I-70 and Highway 82 About 65 miles via I-70 and Highway 82

Road distances are from OpenStreetMap routing (OSRM), computed October 25, 2026, measured from each airport's reference point; they are not drive times. Both alternatives reach Aspen through mountain terrain on I-70 and Highway 82, so winter weather, closures and traffic can lengthen the transfer considerably; check Colorado DOT conditions (COtrip) for the day. EGE has no wingspan limit in its FAA remarks and is the one with customs. The operator decides which airport suits the aircraft and the weather.

Routes that use Aspen

Questions clients ask

Is Aspen airport closed in 2027?

Yes, to all flights from 11 p.m. on April 4, 2027 to 7 p.m. on November 19, 2027. Plan summer 2027 trips through another airport: Eagle County (EGE), about 68 road miles from Aspen, or Rifle (RIL), about 65, which the county names for general aviation during the closure.

Can a large-cabin jet fly into Aspen?

Only if its wingspan is 95 feet or less, and the operator's performance check passes at Aspen's elevation. Some large-cabin and ultra-long-range jets are excluded by wingspan alone.

What time does Aspen airport close?

At 11 p.m., with no departures after 10:30 p.m. It reopens at 7 a.m.

Can we fly to Aspen directly from Canada or Mexico?

Not in the usual case. ASE has no customs. From Canada the flight clears first at an airport with CBP service, such as Eagle County (EGE), a user-fee airport, then continues; from Mexico it first lands at the designated airport nearest to where it crosses the border unless CBP has exempted it (19 CFR 122.24).

Will we need a fuel stop on the way home?

Possibly. Elevation and temperature can limit the fuel or load an aircraft can carry out of Aspen. Ask the operator before booking.

Palm Beach Jets is an independent private aviation advisory firm. Charter flights are conducted by appropriately certificated third-party operators, which retain operational control.

Request charter options

For a round trip or several stops, enter the first date and add the others in the notes.

Return date, luggage (golf bags, skis), pets, flexibility, or each further leg.

Sending a request does not book a flight. The confirmation shows your reference number.

Prefer to email first? Write to us at charter@palmbeachjets.net with a brief outline of your trip.

Prefer to talk first? Charter phone: (561) 235-1512